Translate technical measures into an investment model

Commercial Building Energy Upgrade

EcoComfort™ and selected envelope pathways assessed against operating profile, annual saving and simple payback.

Customer problem

Energy cost, comfort and ageing plant must be considered together

Equipment replacement without load, control and envelope context can miss the best project outcome.

Nusfun solution

Model a coordinated pathway

EcoComfort™ may integrate cooling, heating, domestic hot water and heat recovery. NusTherm™, NusCoolWall™ or CleanShield™ may be assessed as separate project modules where relevant.

China-side capability

Engineering and equipment coordination

JJDZ supports system architecture, technical selection, control logic, supplier coordination and technical-document preparation.

Australian delivery

Local baseline and project coordination

Nusfun works from site data, energy bills, operating hours, compliance requirements and local delivery partners.

Investment model

Make the business case visible

  • Annual cost before
  • Annual cost after
  • Annual saving
  • Capital cost
  • Simple payback
  • 5 / 10-year saving

Assessment requirement

Energy and payback results depend on climate, building loads, tariffs, operating profile, design, controls and installation. Forecasts must be validated for the project.

Request an Energy Project Assessment